Skip to main content
Sinter Hydraulics manufacturing facility 2

Quality You Can Verify

Our quality management system is independently certified and audited. Every machine we build meets international standards for safety, performance, and manufacturing quality.

Certifications & Approvals

Our Credentials

EPR Certificate

Legal Compliance & Authorization

An EPR (Extended Producer Responsibility) Certificate is a mandatory CPCB-issued regulatory compliance document obtained by Sinter Hydraulics in India to legally manufacture, import, or deal in products generating regulated waste (such as plastics, batteries, or e-waste).It legally safeguards Sinter Hydraulics from severe environmental compensation fines, cargo clearance blocks at ports, and statutory business shutdowns.

GST Certificate

Global Credibility & Supply Chain Trust

GST certificate legally authorizes Sinter Hydraulics to conduct business and collect taxes across India while enabling the claiming of Input Tax Credit (ITC) to lower operational costs. For international trade, a GST registration allows Sinter Hydraulics to effortlessly export goods on a Letter of Undertaking (LUT) without paying integrated tax upfront or to claim hassle-free tax refunds on export inputs.

ICEGATE Certificate

Frictionless Export Operations

Working alongside their ICEGATE registration, a GSTIN allows Sinter Hydraulics to effortlessly execute zero-rated exports using a Letter of Undertaking (LUT) or claim fast-tracked refunds on duties paid. It establishes verified business credibility with both local and international partners, ensuring seamless regulatory clearance and compliance across Indian markets.

LUT Certificate

Streamlined Global Compliance

Holding an LUT is mandatory for seamless customs clearance, legally empowering Sinter Hydraulics to execute zero-rated exports efficiently from India.

RCMC Certificate

Global Credibility & Market Expansion

The RCMC legally establishes Sinter Hydraulics as a recognized exporter, ensuring compliance with the Directorate General of Foreign Trade (DGFT). Holding an RCMC builds international trust with overseas buyers and customs authorities, facilitating smooth global market entry and participation in trade promotion events.

REX Certificate

Preferential Tariff Access

REX (Registered Exporter) registration allows Sinter Hydraulics to independently self-certify the origin of its goods on commercial invoices, replacing the need for traditional government-issued certificates of origin. Holding a REX certificate enables international buyers in the European Union and participating regions to claim reduced or zero import duties under preferential trade arrangements, making products from Sinter Hydraulics more competitively priced.

Udyam Certificate

Support for Global Expansion & Exports

A UDYAM registration formally recognizes Sinter Hydraulics as an official MSME. Holding a UDYAM certificate simplifies participation in international trade fairs, enables easier clearance of export incentives, and provides protection against delayed payments

IEC Certificate

Mandatory Gateway for International Trade

An Importer-Exporter Code (IEC) is a primary legal requirement issued by the DGFT, authorizing Sinter Hydraulics to legally ship goods globally and clear customs in India. Holding an IEC enables Sinter Hydraulics to seamlessly open currents in international banking channels, receive foreign payments, and handle global logistics without regulatory blocks.

cert-ce.png cert-csa.png cert-sgs.png cert-bureau-veritas.png cert-standards-australia.png cert-zed.png

How We Build Quality In

Our Quality Process

1

Design Review

Every new machine design undergoes formal design FMEA before release to production

2

Incoming Inspection

All critical bought-out items (cylinders, valves, seals) are incoming-inspected against test certificates

3

In-Process Checks

Stage-wise inspection at fabrication, machining, and sub-assembly with recorded inspection reports

4

Pressure Testing

All hydraulic circuits pressure-tested at 1.5× rated working pressure before installation

5

Final Run-Off

Every press completes a documented 50-cycle run-off at rated load before dispatch clearance

Design Standards

Standards We Design To

StandardTitleApplies ToStatus
IS 8833 Hydraulic Presses — Safety Requirements All press models Compliant
EN 693 Machine Tools — Safety — Hydraulic Presses Export machines Compliant
IS 13947 Low Voltage Switchgear & Control Gear All electrical panels Compliant
ISO 4413 Hydraulic Fluid Power — General Rules Hydraulic systems Compliant
IEC 60204-1 Safety of Machinery — Electrical Equipment All machines Compliant
IS 2825 Code for Unfired Pressure Vessels Hydraulic accumulators Compliant
IS 4029 Guide to Testing of Three-Phase Induction Motors All drive motors Compliant